ITAC Assessment: WM0261
ITAC logo
ITAC Assessment: WM0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product commercial and industrial equipment
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $500
k
to 1
M
# of Employees 25
Plant Area 15,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 2,750
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,830 368,460
kWh
Electricity Demand $52,830 2,697
kW-mo/yr
Electricity Fees $10,904 -
Natural Gas $48,310 6,238
MMBtu
Waste Disposal Costs
Water Usage $3,954 1,430
Tgal
TOTAL YEARLY COSTS $142,828
RECOMMENDED SAVINGS* $17,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,535 $5,782 $4,488
61,479
kWh
$4,047
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $5,340 $7,400 $2,808
38,471
kWh
$2,532
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $1,994 $2,950 $1,096
15,014
kWh
$437
-
kW-mo/yr
$461
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $1,552 $1,075 $1,398
19,150
kWh
$154
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,421 $17,207 $9,790
134,114
kWh
$7,170
-
kW-mo/yr
$461
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs