ITAC Assessment: WM0263
ITAC logo
ITAC Assessment: WM0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product PSA Tape
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 19
Plant Area 37,660
ft2
Annual Production 520
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,560 585,011
kWh
Electricity Demand $40,436 2,057
kW-mo/yr
Electricity Fees $6,734 -
Natural Gas $28,145 7,700
MMBtu
TOTAL YEARLY COSTS $113,875
RECOMMENDED SAVINGS* $4,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,080 $3,550 $2,188
33,144
kWh
$892
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,056 - $750
11,365
kWh
$306
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $325 $250 $179
2,716
kWh
$146
-
kW-mo/yr
04 2.7224: Reduce space conditioning during non-working hours $191 $100 $191
2,892
kWh
-
TOTAL RECOMMENDED $4,653 $3,900 $3,308
50,117
kWh
$1,345
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs