ITAC Assessment: MZ0033
ITAC logo
ITAC Assessment: MZ0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product air intake hoses, valves
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 189
Plant Area 200,000
ft2
Annual Production 38,000,000
pieces
Production Hrs. Annual 5,900
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $866,634 15,086,400
kWh
Natural Gas $158,094 16,211
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $2,783 $990 $2,783
50,650
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,040 $46,900 $14,040
255,446
kWh
-
03 2.7135: Install occupancy sensors $169 $178 $169
3,083
kWh
-
04 2.7135: Install occupancy sensors $259 $178 $259
4,707
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $13,936 $400 $13,936
142,797
kWh
-
06 2.2437: Recover waste heat from equipment $1,579 $8,000 - $1,579
-
MMBtu
TOTAL RECOMMENDED $32,766 $56,646 $31,187
456,683
kWh
$1,579
-
MMBtu
TOTAL IMPLEMENTED $28,404 $47,656 $28,404
406,033
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs