| Assessment Year | 2026 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 8 |
| Plant Area |
520,000
ft2
|
| Annual Production | 2,365,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $258,745 | 3,282,960 |
kWh
|
$0.079 |
| Electricity Demand | $104,359 | 10,309 |
kW-mo/yr
|
$10.12 |
| Electricity Fees | $14,170 | - |
|
- |
| Natural Gas | $29,484 | 4,140 |
MMBtu
|
$7.12 |
| TOTAL YEARLY COSTS | $406,758 | |||
| RECOMMENDED SAVINGS* | $66,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $510 | - |
$441
4,950
kWh
|
$69
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,055 | $1,887 |
$2,585
29,039
kWh
|
$470
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,322 | $8,827 |
$1,322
14,489
kWh
|
- | - | |
| 04 | 2.9114: Use solar heat to make electricty | $49,956 | $132,300 |
$49,180
83,589
kWh
|
$776
-
kW-mo/yr
|
- | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $11,641 | $100,000 | - | - |
$11,641
-
MMBtu
|
|
| TOTAL RECOMMENDED | $66,484 | $243,014 |
$53,528
132,067
kWh
|
$1,315
-
kW-mo/yr
|
$11,641
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs