ITAC Assessment: OR0540
ITAC logo
ITAC Assessment: OR0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Process Chemicals
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 49,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,900 1,620,000
kWh
Electricity Demand $22 4
kW-mo/yr
Electricity Fees $627 -
Natural Gas $46 353
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 3.4114: Replace city water with recycled water via cooling tower $29 $10,000 - - - $8
-
Tgal
- $21
-
Tgal
02 2.2121: Increase amount of condensate returned $14,149 $6,100 - - $14,149
-
MMBtu
- - -
03 2.7135: Install occupancy sensors $2,932 $13,049 $1,561
24,960
kWh
$178
-
kW-mo/yr
- - $1,193 -
04 2.9114: Use solar heat to make electricty $23,433 $257,380 $23,433
351,000
kWh
- - - - -
05 2.4226: Use / purchase optimum sized compressor $434 $12,400 $434
5,793
kWh
- - - - -
06 2.4239: Eliminate or reduce compressed air usage $2,216 - $2,216
35,432
kWh
- - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $699 $1,398 $699
10,290
kWh
- - - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $341 - $341
4,992
kWh
- - - - -
TOTAL RECOMMENDED $44,233 $300,327 $28,684
432,467
kWh
$178
-
kW-mo/yr
$14,149
-
MMBtu
$8
-
Tgal
$1,193 $21
-
Tgal
TOTAL IMPLEMENTED $17,110 $29,149 $1,561
24,960
kWh
$178
-
kW-mo/yr
$14,149
-
MMBtu
$8
-
Tgal
$1,193 $21
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs