ITAC Assessment: WV0580
ITAC logo
ITAC Assessment: WV0580
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Air-dried recycled pulp
NAICS 322110: Pulp Mills
SIC 2611: Pulp Mills
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 566,280
ft2
Annual Production 218,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Natural Gas $2,797,754 775,856
MMBtu
TOTAL YEARLY COSTS $2,797,754
RECOMMENDED SAVINGS* $474,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $156,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Personnel Changes Savings By-product Production Savings
01 2.2414: Use waste heat from hot flue gases to preheat $265,061 $31,000 $265,061
-
MMBtu
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $143,962 $6,000 $143,988
-
MMBtu
$(-26.0) -
03 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $52,590 $160,314 - - $52,590
04 2.2437: Recover waste heat from equipment $8,437 $15,360 $8,437
-
MMBtu
- -
05 2.2511: Insulate bare equipment $2,238 $2,550 $2,238
-
MMBtu
- -
06 2.2113: Repair or replace steam traps $1,791 $5,731 $1,848
-
MMBtu
$(-57.0) -
TOTAL RECOMMENDED $474,079 $220,955 $421,572
-
MMBtu
$(-83.0) $52,590
TOTAL IMPLEMENTED $156,428 $29,641 $156,511
-
MMBtu
$(-83.0) -
Yearly Savings* Imp'd Cost* Natural Gas Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs