Assessment Year | 2005 |
---|---|
Principal Product | Cartons for the food industry |
NAICS | 322212: Folding Paperboard Box Manufacturing |
SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
Sales Range | $10 M to 50M |
# of Employees | 124 |
Plant Area |
156,000
ft2
|
Annual Production | 999,999,999
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $226,006 | 8,128,000 |
kWh
|
$0.028 |
Electricity Demand | $141,768 | 14,799 |
kW-mo/yr
|
$9.58 |
Electricity Fees | $12,059 | - |
|
- |
Natural Gas | $15,780 | 1,566 |
MMBtu
|
$10.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,041 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,841 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $9,359 | $20,313 |
$6,307
226,800
kWh
|
$3,052
-
kW-mo/yr
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $6,017 | $2,450 | - | - |
$6,017
-
MMBtu
|
- | - | |
03 | 4.211: Consider use / purchase of bulk materials where possible | $15,600 | $1,000 | - | - | - | - | $15,600 | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $13,767 | $6,500 |
$13,767
495,024
kWh
|
- | - | - | - | |
05 | 4.212: Adopt in-house material generation | $3,600 | $4,000 | - | - | - | $3,600 | - | |
06 | 2.7135: Install occupancy sensors | $1,493 | $2,000 |
$972
34,943
kWh
|
$521
-
kW-mo/yr
|
- | - | - | |
07 | 2.7132: Install timers on light switches in little used areas | $867 | $750 |
$629
22,630
kWh
|
$238
-
kW-mo/yr
|
- | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $338 | $160 |
$111
4,004
kWh
|
$227
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $51,041 | $37,173 |
$21,786
783,401
kWh
|
$4,038
-
kW-mo/yr
|
$6,017
-
MMBtu
|
$3,600 | $15,600 | ||
TOTAL IMPLEMENTED | $31,841 | $32,173 |
$21,786
783,401
kWh
|
$4,038
-
kW-mo/yr
|
$6,017
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs