ITAC Assessment: WM0260
ITAC logo
ITAC Assessment: WM0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Abrasion-resistant steel
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 72,550
ft2
Annual Production 50
ton
Production Hrs. Annual 2,990
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,193 755,462
kWh
Electricity Demand $67,096 3,423
kW-mo/yr
Electricity Fees $14,923 -
Natural Gas $16,914 2,079
MMBtu
Waste Disposal Costs
Water Usage $7,868 543
Tgal
TOTAL YEARLY COSTS $162,994
RECOMMENDED SAVINGS* $33,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $20,053 - - $20,053
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,830 $6,760 $7,213
97,468
kWh
$2,617
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $1,623 - $1,266
17,114
kWh
$357
-
kW-mo/yr
04 2.7135: Install occupancy sensors $1,611 $300 $1,145
15,468
kWh
$467
-
kW-mo/yr
05 2.2135: Repair and eliminate steam leaks $128 $377 $101
1,358
kWh
$27
-
kW-mo/yr
TOTAL RECOMMENDED $33,245 $7,437 $9,724
131,408
kWh
$23,521
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs