| Assessment Year | 2026 |
|---|---|
| Principal Product | Abrasion-resistant steel |
| NAICS | 332618: Other Fabricated Wire Product Manufacturing |
| SIC | 3548: Electric and Gas Welding and Soldering Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
72,550
ft2
|
| Annual Production | 50
ton
|
| Production Hrs. Annual | 2,990
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $56,193 | 755,462 |
kWh
|
$0.074 | |
| Electricity Demand | $67,096 | 3,423 |
kW-mo/yr
|
$19.60 | |
| Electricity Fees | $14,923 | - |
|
- | |
| Natural Gas | $16,914 | 2,079 |
MMBtu
|
$8.14 | |
| Waste Disposal Costs | |||||
| Water Usage | $7,868 | 543 |
Tgal
|
$14.49 | |
| TOTAL YEARLY COSTS | $162,994 | ||||
| RECOMMENDED SAVINGS* | $33,245 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $20,053 | - | - |
$20,053
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,830 | $6,760 |
$7,213
97,468
kWh
|
$2,617
-
kW-mo/yr
|
|
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $1,623 | - |
$1,266
17,114
kWh
|
$357
-
kW-mo/yr
|
|
| 04 | 2.7135: Install occupancy sensors | $1,611 | $300 |
$1,145
15,468
kWh
|
$467
-
kW-mo/yr
|
|
| 05 | 2.2135: Repair and eliminate steam leaks | $128 | $377 |
$101
1,358
kWh
|
$27
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $33,245 | $7,437 |
$9,724
131,408
kWh
|
$23,521
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs