Assessment Year | 1995 |
---|---|
Principal Product | Metal Connectors |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
100,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 5,005
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,450 | 844,959 |
kWh
|
$0.067 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,771 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,231 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $115 | - |
$115
2,345
kWh
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $8,692 | - | - | $8,692 | |
03 | 2.7134: Use photocell controls | $3,673 | $5,400 |
$3,673
70,633
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,653 | $586 |
$2,653
43,962
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,363 | $2,828 |
$1,363
21,688
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $379 | $666 |
$379
7,327
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $952 | $1,780 |
$952
14,361
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $269 | $775 |
$269
5,275
kWh
|
- | |
09 | 2.7111: Reduce illumination to minimum necessary levels | $200 | $280 |
$200
2,052
kWh
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,475 | $1,000 |
$3,475
51,876
kWh
|
- | |
TOTAL RECOMMENDED | $21,771 | $13,315 |
$13,079
219,519
kWh
|
$8,692 | ||
TOTAL IMPLEMENTED | $12,231 | $11,594 |
$12,231
204,865
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs