Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TS0033 #06 Y:1985 Analyze flue gas for proper air/fuel ratio $922 $1,300
TS0033 #05 Y:1985 Install compressor air intakes in coolest locations $1,451 $1,000
TS0033 #04 Y:1985 Reduce illumination to minimum necessary levels $1,601 -
TS0033 #03 Y:1985 Utilize higher efficiency lamps and/or ballasts $1,996 $178
TS0033 #02 Y:1985 Use optimum thickness insulation $1,345 $2,730
TS0033 #01 Y:1985 Insulate bare equipment $13,881 $2,730
TS0032 #04 Y:1985 Turn off equipment during breaks, reduce operating time $1,690 -
TS0032 #03 Y:1985 Utilize higher efficiency lamps and/or ballasts $635 $178
TS0032 #02 Y:1985 Close holes and openings in building such as broken windows $8,661 $4,000
TS0032 #01 Y:1985 Replace electrically-operated equipment with fossil fuel equipment $6,844 $1,500
TS0031 #06 Y:1985 Install vinyl strip / high speed / air curtain doors $3,081 $500
TS0031 #05 Y:1985 Utilize higher efficiency lamps and/or ballasts $1,076 $280
TS0031 #04 Y:1985 Reduce glazed areas in buildings $1,681 $1,360
TS0031 #03 Y:1985 Eliminate leaks in inert gas and compressed air lines/ valves $1,147 $50
TS0031 #02 Y:1985 Recover waste heat from equipment $2,504 $3,500
TS0031 #01 Y:1985 Optimize plant power factor $18,150 $13,550
TS0029 #03 Y:1985 Utilize higher efficiency lamps and/or ballasts $3,514 $2,892
TS0029 #02 Y:1985 Eliminate leaks in inert gas and compressed air lines/ valves $3,874 $100
TS0029 #01 Y:1985 Optimize plant power factor $65,767 $60,000
TS0028 #03 Y:1985 Install compressor air intakes in coolest locations $811 $300