ITAC Assessment: TS0029
ITAC logo
ITAC Assessment: TS0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product STRUCTURED STEEL TUBING
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 39,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,620 2,530,188
kWh
Natural Gas $11,691 2,301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $65,767 $60,000 $65,767
-
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,874 $100 $3,874
44,842
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,514 $2,892 $3,514
40,739
kWh
TOTAL RECOMMENDED $73,155 $62,992 $73,155
85,581
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs