Assessment Year | 2018 |
---|---|
Principal Product | Circuit Board Plating |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
30,000
ft2
|
Annual Production | 215,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $260,363 | 1,739,487 |
kWh
|
$0.15 | |
Electricity Demand | $78,020 | 5,160 |
kW-mo/yr
|
$15.12 | |
Electricity Fees | $6,094 | - |
|
- | |
Natural Gas | $3,067 | 234 |
MMBtu
|
$13.10 | |
Waste Disposal Costs | |||||
Water Usage | $27,591 | 6,143 |
Tgal
|
$4.49 | |
Water Disposal | $49,809 | 8,503 |
Tgal
|
$5.86 | |
TOTAL YEARLY COSTS | $424,944 | ||||
RECOMMENDED SAVINGS* | $150,656 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $29,002 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,086 | - |
$2,211
21,870
kWh
|
- | - | - | $(-1,125.0) | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $19,866 | - |
$19,866
129,691
kWh
|
- | - | - | - | - | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,280 | - |
$1,280
8,356
kWh
|
- | - | - | - | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $7,491 | - |
$7,491
48,906
kWh
|
- | - | - | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $136 | $80 |
$112
730
kWh
|
$24
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,822 | $15,554 |
$13,810
90,158
kWh
|
$3,012
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,916 | $35,168 |
$21,852
142,638
kWh
|
$5,251
-
kW-mo/yr
|
- | - | $1,548 | $(-735.0) | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,211 | $4,676 |
$1,815
11,852
kWh
|
$396
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,802 | $28,747 |
$8,802
57,463
kWh
|
- | - | - | - | - | |
10 | 3.5131: Recycle white water | $65,046 | $196,690 | - | - |
$27,591
-
Tgal
|
$37,455
-
Tgal
|
- | - | |
TOTAL RECOMMENDED | $150,656 | $280,915 |
$77,239
511,664
kWh
|
$8,683
-
kW-mo/yr
|
$27,591
-
Tgal
|
$37,455
-
Tgal
|
$423 | $(-735.0) | ||
TOTAL IMPLEMENTED | $29,002 | $35,168 |
$24,063
164,508
kWh
|
$5,251
-
kW-mo/yr
|
- | - | $423 | $(-735.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs