ITAC Assessment: SF0514
ITAC logo
ITAC Assessment: SF0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Circuit Board Plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 30,000
ft2
Annual Production 215,000
units
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,363 1,739,487
kWh
Electricity Demand $78,020 5,160
kW-mo/yr
Electricity Fees $6,094 -
Natural Gas $3,067 234
MMBtu
Waste Disposal Costs
Water Usage $27,591 6,143
Tgal
Water Disposal $49,809 8,503
Tgal
TOTAL YEARLY COSTS $424,944
RECOMMENDED SAVINGS* $150,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,086 - $2,211
21,870
kWh
- - - $(-1,125.0) -
02 2.4231: Reduce the pressure of compressed air to the minimum required $19,866 - $19,866
129,691
kWh
- - - - -
03 2.6212: Turn off equipment during breaks, reduce operating time $1,280 - $1,280
8,356
kWh
- - - - -
04 2.6212: Turn off equipment during breaks, reduce operating time $7,491 - $7,491
48,906
kWh
- - - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $136 $80 $112
730
kWh
$24
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,822 $15,554 $13,810
90,158
kWh
$3,012
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $27,916 $35,168 $21,852
142,638
kWh
$5,251
-
kW-mo/yr
- - $1,548 $(-735.0)
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,211 $4,676 $1,815
11,852
kWh
$396
-
kW-mo/yr
- - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,802 $28,747 $8,802
57,463
kWh
- - - - -
10 3.5131: Recycle white water $65,046 $196,690 - - $27,591
-
Tgal
$37,455
-
Tgal
- -
TOTAL RECOMMENDED $150,656 $280,915 $77,239
511,664
kWh
$8,683
-
kW-mo/yr
$27,591
-
Tgal
$37,455
-
Tgal
$423 $(-735.0)
TOTAL IMPLEMENTED $29,002 $35,168 $24,063
164,508
kWh
$5,251
-
kW-mo/yr
- - $423 $(-735.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs