ITAC Assessment: TS0032
ITAC logo
ITAC Assessment: TS0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product RUBBER-TO-METAL PRODUCTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 163
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,916 3,288,101
kWh
Natural Gas $50,557 9,483
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,844 $1,500 $9,700
125,733
kWh
$(-2,856.0)
-
MMBtu
02 2.7444: Close holes and openings in building such as broken windows $8,661 $4,000 - $8,661
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $635 $178 $635
8,206
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,690 - $1,690
21,981
kWh
-
TOTAL RECOMMENDED $17,830 $5,678 $12,025
155,920
kWh
$5,805
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs