ITAC Assessment: AS0334
ITAC logo
ITAC Assessment: AS0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Photo masks, glass plates for PC chips, etching glass, and chrome
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 30,000
ft2
Annual Production 26,280
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,938 5,784,960
kWh
Electricity Demand $24,610 9,721
kW-mo/yr
Electricity Fees $27,657 -
Natural Gas $36,527 4,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $2,317 - $2,317
65,989
kWh
- - - -
02 2.7111: Reduce illumination to minimum necessary levels $1,247 $312 $414
8,279
kWh
$833
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $667 $1,350 $348
9,899
kWh
$319
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $424 $441 $263
7,472
kWh
$161
-
kW-mo/yr
- - -
05 2.7272: Install heat pipes / raise cooling setpoint $32,221 $12,000 - - $32,221
-
MMBtu
- -
06 2.7225: Close outdoor air dampers during warm-up / cool-down periods $3,596 $60 $2,338
66,576
kWh
$1,258
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,710 $5,232 $2,594
73,868
kWh
$1,116
-
kW-mo/yr
- - -
08 2.7442: Keep doors and windows shut when not on use $3,926 $85 $2,589
73,730
kWh
$1,337
-
kW-mo/yr
- - -
09 3.4111: Use closed cycle process to minimize waste water production $6,865 $8,955 - - - $6,865
-
Tgal
-
10 4.111: Add equipment/ operators to reduce production bottleneck $379 $546 - - - - $379
TOTAL RECOMMENDED $55,352 $28,981 $10,863
305,813
kWh
$5,024
-
kW-mo/yr
$32,221
-
MMBtu
$6,865
-
Tgal
$379
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs