Assessment Year | 1995 |
---|---|
Principal Product | Giftware figurines |
NAICS |
n/a
|
SIC | 3269: Pottery Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 590 |
Plant Area |
140,265
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,384 | 3,038,980 |
kWh
|
$0.063 |
Natural Gas | $36,245 | 9,646 |
MMBtu
|
$3.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,471 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $6,083 | $777 | - |
$6,083
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,696 | $120 |
$2,696
74,736
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,274 | $5,044 |
$1,274
8,792
kWh
|
- | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $983 | $3,400 |
$983
26,084
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $894 | $1,344 |
$894
8,206
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $607 | $4,300 |
$607
11,137
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $3,722 | $39,200 |
$3,722
110,492
kWh
|
- | |
TOTAL RECOMMENDED | $16,259 | $54,185 |
$10,176
239,447
kWh
|
$6,083
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,471 | $10,808 |
$5,471
102,871
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs