Assessment Year 1985
Principal Product PLUMBING FIXTURES
NAICS
n/a
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 720,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,432 2,322,685
kWh
Natural Gas $67,380 13,666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $18,150 $13,550 $18,150
-
kWh
-
02 2.2437: Recover waste heat from equipment $2,504 $3,500 - $2,504
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,147 $50 $1,147
17,292
kWh
-
04 2.7421: Reduce glazed areas in buildings $1,681 $1,360 - $1,681
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,076 $280 $1,076
16,120
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,081 $500 - $3,081
-
MMBtu
TOTAL RECOMMENDED $27,639 $19,240 $20,373
33,412
kWh
$7,266
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs