ITAC Assessment: WV0163
ITAC logo
ITAC Assessment: WV0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fiber filters
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 100,000
ft2
Annual Production 357,000
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,806 3,606,389
kWh
Natural Gas $267,372 75,878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,038 $30 $2,038
71,805
kWh
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,261 $132 $1,261
44,549
kWh
- - - - -
03 2.7241: Install outside air damper / economizer on hvac unit $1,997 $1,290 $1,997
70,340
kWh
- - - - -
04 2.1331: Burn a less expensive grade of fuel $4,974 $6,400 - $(-3,387.0)
-
MMBtu
$8,361
-
MMBtu
- - -
05 2.2511: Insulate bare equipment $3,844 $390 - $3,844
-
MMBtu
- - - -
06 2.2437: Recover waste heat from equipment $947 $616 - $947
-
MMBtu
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $740 $420 $740
26,084
kWh
- - - - -
08 2.2442: Preheat combustion air with waste heat $1,619 $3,500 - $1,619
-
MMBtu
- - - -
09 3.3131: Use evaporation to concentrate material $1,854 $1,075 - - - $1,854
-
Tgal
- -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $49,719 $11,000 - - - - $49,719
-
lb
-
11 4.111: Add equipment/ operators to reduce production bottleneck $22,950 - - - - - - $22,950
TOTAL RECOMMENDED $91,943 $24,853 $6,036
212,778
kWh
$3,023
-
MMBtu
$8,361
-
MMBtu
$1,854
-
Tgal
$49,719
-
lb
$22,950
TOTAL IMPLEMENTED $81,625 $13,887 $3,258
114,889
kWh
$3,844
-
MMBtu
- $1,854
-
Tgal
$49,719
-
lb
$22,950
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs