ITAC Assessment: SD0082
ITAC logo
ITAC Assessment: SD0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Steam Generators, Dynamometers
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 110,000
ft2
Annual Production 250
pieces
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,709 2,023,740
kWh
Natural Gas $95,672 15,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,491 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,695

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,320 $2,540 $3,320
31,067
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,666 $800 $6,666
62,427
kWh
-
03 2.2113: Repair or replace steam traps $34,607 $925 - $34,607
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $4,140 $450 - $4,140
-
MMBtu
05 2.2153: Close off unneeded steam lines $3,376 $2,500 - $3,376
-
MMBtu
06 2.2511: Insulate bare equipment $1,613 $655 - $1,613
-
MMBtu
07 2.4131: Size electric motors for peak operating efficiency $4,678 $570 $4,678
43,962
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,278 $3,560 $3,278
30,188
kWh
-
09 2.7144: Install spectral reflectors / delamp $5,162 $5,175 $5,162
42,790
kWh
-
10 2.7132: Install timers on light switches in little used areas $57 $25 $57
586
kWh
-
11 2.7134: Use photocell controls $594 $230 $594
4,982
kWh
-
TOTAL RECOMMENDED $67,491 $17,430 $23,755
216,002
kWh
$43,736
-
MMBtu
TOTAL IMPLEMENTED $23,695 $8,575 $17,942
167,644
kWh
$5,753
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs