ITAC Assessment: TS0028
ITAC logo
ITAC Assessment: TS0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product STRUCTURAL STEEL TUBING
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area
n/a
Annual Production 22,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,019 922,919
kWh
Natural Gas $20,906 4,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,831 - $9,831
-
kWh
02 2.7111: Reduce illumination to minimum necessary levels $3,428 - $3,428
31,360
kWh
03 2.4221: Install compressor air intakes in coolest locations $811 $300 $811
7,327
kWh
TOTAL RECOMMENDED $14,070 $300 $14,070
38,687
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs