ITAC Assessment: TS0033
ITAC logo
ITAC Assessment: TS0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product POLYETHYLENE FOAM PADDIN
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range n/a
# of Employees 105
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $469,927 7,244,432
kWh
Natural Gas $241,704 48,997
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $13,881 $2,730 - $13,881
-
MMBtu
02 2.2515: Use optimum thickness insulation $1,345 $2,730 $1,345
20,809
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,996 $178 $1,996
30,774
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $1,601 - $1,601
24,619
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,451 $1,000 $1,451
22,274
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $922 $1,300 - $922
-
MMBtu
TOTAL RECOMMENDED $21,196 $7,938 $6,393
98,476
kWh
$14,803
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs