Assessment Year | 1986 |
---|---|
Principal Product | POLYETHYLENE FOAM PADDIN |
NAICS |
n/a
|
SIC | 3086: Plastics Foam Products |
Sales Range | n/a |
# of Employees | 105 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $469,927 | 7,244,432 |
kWh
|
$0.065 |
Natural Gas | $241,704 | 48,997 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,196 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $13,881 | $2,730 | - |
$13,881
-
MMBtu
|
|
02 | 2.2515: Use optimum thickness insulation | $1,345 | $2,730 |
$1,345
20,809
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,996 | $178 |
$1,996
30,774
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,601 | - |
$1,601
24,619
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,451 | $1,000 |
$1,451
22,274
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $922 | $1,300 | - |
$922
-
MMBtu
|
|
TOTAL RECOMMENDED | $21,196 | $7,938 |
$6,393
98,476
kWh
|
$14,803
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs