ITAC Assessment: UD0987
ITAC logo
ITAC Assessment: UD0987
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 609,840
ft2
Annual Production 9,100,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,436,352 15,246,010
kWh
Natural Gas $494,516 108,488
MMBtu
Waste Disposal Costs
Water Usage $113,740 609,840
Tgal
TOTAL YEARLY COSTS $2,044,608
RECOMMENDED SAVINGS* $325,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6125: Keep equipment clean $25,586 $12,000 - $25,586
-
MMBtu
02 2.1336: Install equipment to utilize waste fuel $97,475 $50,000 - $97,475
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $104,092 $125,000 $104,092
1,107,360
kWh
-
04 2.4322: Use or replace with energy efficient substitutes $30,220 $126,000 $30,220
321,492
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,729 $13,500 $18,729
199,249
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,292 $8,675 $18,292
194,597
kWh
-
07 2.4322: Use or replace with energy efficient substitutes $8,160 $30,000 $8,160
86,812
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,933 $40,500 $22,933
243,972
kWh
-
TOTAL RECOMMENDED $325,487 $405,675 $202,426
2,153,482
kWh
$123,061
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs