Assessment Year | 2018 |
---|---|
Principal Product | Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
609,840
ft2
|
Annual Production | 9,100,000
Tgal
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,436,352 | 15,246,010 |
kWh
|
$0.094 | |
Natural Gas | $494,516 | 108,488 |
MMBtu
|
$4.56 | |
Waste Disposal Costs | |||||
Water Usage | $113,740 | 609,840 |
Tgal
|
$0.19 | |
TOTAL YEARLY COSTS | $2,044,608 | ||||
RECOMMENDED SAVINGS* | $325,487 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6125: Keep equipment clean | $25,586 | $12,000 | - |
$25,586
-
MMBtu
|
|
02 | 2.1336: Install equipment to utilize waste fuel | $97,475 | $50,000 | - |
$97,475
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $104,092 | $125,000 |
$104,092
1,107,360
kWh
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $30,220 | $126,000 |
$30,220
321,492
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,729 | $13,500 |
$18,729
199,249
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,292 | $8,675 |
$18,292
194,597
kWh
|
- | |
07 | 2.4322: Use or replace with energy efficient substitutes | $8,160 | $30,000 |
$8,160
86,812
kWh
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,933 | $40,500 |
$22,933
243,972
kWh
|
- | |
TOTAL RECOMMENDED | $325,487 | $405,675 |
$202,426
2,153,482
kWh
|
$123,061
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs