1,112
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0738 #01 Y:2021 | 01 | 2021 | Train operators for maximum operating efficiency | $242,489 | $81,465 | |
| OR0737 #05 Y:2020 | 05 | 2020 | Use or replace with energy efficient substitutes | $3,820 | $8,556 | |
| OR0737 #04 Y:2020 | 04 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $2,884 | - | |
| OR0737 #03 Y:2020 | 03 | 2020 | Use optimum size and capacity equipment | $5,949 | - | |
| OR0737 #02 Y:2020 | 02 | 2020 | Use optimum size and capacity equipment | $7,614 | - | |
| OR0737 #01 Y:2020 | 01 | 2020 | Use or replace with energy efficient substitutes | $7,782 | - | |
| OR0732 #06 Y:2019 | 06 | 2019 | Reduce the pressure of compressed air to the minimum required | $2,586 | - | |
| OR0732 #05 Y:2019 | 05 | 2019 | Use synthetic lubricant | $9,084 | - | |
| OR0732 #04 Y:2019 | 04 | 2019 | Reduce the pressure of compressed air to the minimum required | $10,898 | - | |
| OR0732 #03 Y:2019 | 03 | 2019 | Install compressor air intakes in coolest locations | $18,849 | - | |
| OR0732 #02 Y:2019 | 02 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $20,378 | - | |
| OR0732 #01 Y:2019 | 01 | 2019 | Insulate bare equipment | $26,977 | - | |
| OR0724 #05 Y:2019 | 05 | 2019 | Reduce the pressure of compressed air to the minimum required | $2,462 | $218 | |
| OR0724 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $4,637 | $3,836 | |
| OR0724 #03 Y:2019 | 03 | 2019 | Repair and eliminate steam leaks | $49,629 | $100,000 | |
| OR0724 #02 Y:2019 | 02 | 2019 | Reduce the pressure of compressed air to the minimum required | $7,124 | $3,891 | |
| OR0724 #01 Y:2019 | 01 | 2019 | Optimize plant power factor | $10,104 | $18,004 | |
| OR0723 #03 Y:2019 | 03 | 2019 | Use highest temperature for chilling or cold storage | $5,360 | $1,789 | |
| OR0723 #02 Y:2019 | 02 | 2019 | Recover waste heat from equipment | $21,541 | $1,027 | |
| OR0723 #01 Y:2019 | 01 | 2019 | Re-arrange equipment layout to reduce labor costs | $488,033 | $1,500,000 |