Assessment Year | 2019 |
---|---|
Principal Product | Concrete Block and Brick |
NAICS | 327331: Concrete Block and Brick Manufacturing |
SIC | 3271: Concrete Block and Brick |
Sales Range | less than $500 k |
# of Employees | 35 |
Plant Area |
1,414,806
ft2
|
Annual Production | 14,286,209
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $86,505 | 1,828,200 |
kWh
|
$0.047 | |
Electricity Demand | $51,330 | 6,089 |
kW-mo/yr
|
$8.43 | |
Natural Gas | $115,504 | 17,637 |
MMBtu
|
$6.55 | |
Waste Disposal Costs | |||||
Water Usage | $10,298 | 2,488 |
Tgal
|
$4.14 | |
TOTAL YEARLY COSTS | $263,637 | ||||
RECOMMENDED SAVINGS* | $73,956 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $10,104 | $18,004 | - | - | $10,104 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,124 | $3,891 |
$5,679
120,012
kWh
|
$1,445
-
kW-mo/yr
|
- | - | |
03 | 2.2135: Repair and eliminate steam leaks | $49,629 | $100,000 | - | - | - |
$49,629
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,637 | $3,836 |
$3,417
72,245
kWh
|
$895
-
kW-mo/yr
|
$325 | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,462 | $218 |
$2,361
49,921
kWh
|
$101
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $73,956 | $125,949 |
$11,457
242,178
kWh
|
$2,441
-
kW-mo/yr
|
$10,429 |
$49,629
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs