Assessment Year | 2013 |
---|---|
Principal Product | Corrugated Containers |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2675: Die-Cut Paper and Paperboard and Cardboard |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
120,000
ft2
|
Annual Production | 1,170,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $472,465 | 7,384,000 |
kWh
|
$0.064 |
Electricity Demand | $150,062 | 14,251 |
kW-mo/yr
|
$10.53 |
Electricity Fees | $(-51,668.0) | - |
|
- |
Natural Gas | $237,299 | 69,750 |
MMBtu
|
$3.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,168 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,590 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,590 | $1,500 | - | - | - |
$1,590
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $10,000 | $50,000 | - | - | - |
$10,000
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,416 | $10,000 |
$6,868
107,310
kWh
|
$1,548
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $24,521 | $31,163 |
$20,014
312,719
kWh
|
$4,507
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $566 | $1,364 |
$347
5,416
kWh
|
$219
-
kW-mo/yr
|
- | - | - | |
06 | 2.8112: Combine utility meters | $25,405 | $5,000 | - | - | $25,405 | - | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $6,670 | $500 | - | - | - | - |
$6,670
-
Tgal
|
|
TOTAL RECOMMENDED | $77,168 | $99,527 |
$27,229
425,445
kWh
|
$6,274
-
kW-mo/yr
|
$25,405 |
$11,590
-
MMBtu
|
$6,670
-
Tgal
|
||
TOTAL IMPLEMENTED | $1,590 | $1,500 | - | - | - |
$1,590
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs