ITAC Assessment: OR0732
ITAC logo
ITAC Assessment: OR0732
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastic Bottles
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 102
Plant Area 357,000
ft2
Annual Production 8,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,610,927 39,902,600
kWh
Natural Gas $80,204 15,024
MMBtu
TOTAL YEARLY COSTS $1,691,131
RECOMMENDED SAVINGS* $88,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,378

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $26,977 - $26,977
704,724
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,378 - $20,378
532,338
kWh
03 2.4221: Install compressor air intakes in coolest locations $18,849 - $18,849
492,394
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,898 - $10,898
284,700
kWh
05 2.4314: Use synthetic lubricant $9,084 - $9,084
237,317
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,586 - $2,586
67,563
kWh
TOTAL RECOMMENDED $88,772 - $88,772
2,319,036
kWh
TOTAL IMPLEMENTED $20,378 - $20,378
532,338
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs