ITAC Assessment: OR0737
ITAC logo
ITAC Assessment: OR0737
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Freshwater
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 29
Plant Area 2,000
ft2
Annual Production 605,535,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,935 1,916,140
kWh
Electricity Demand $27,983 6,837
kW-mo/yr
Electricity Fees $10,881 -
TOTAL YEARLY COSTS $186,799
RECOMMENDED SAVINGS* $28,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,704

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4322: Use or replace with energy efficient substitutes $7,782 - $4,191
61,036
kWh
$3,591
-
kW-mo/yr
02 2.4323: Use optimum size and capacity equipment $7,614 - $4,681
68,182
kWh
$2,933
-
kW-mo/yr
03 2.4323: Use optimum size and capacity equipment $5,949 - $4,126
60,097
kWh
$1,823
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,884 - $2,884
42,010
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $3,820 $8,556 $2,649
38,583
kWh
$1,171
-
kW-mo/yr
TOTAL RECOMMENDED $28,049 $8,556 $18,531
269,908
kWh
$9,518
-
kW-mo/yr
TOTAL IMPLEMENTED $6,704 $8,556 $5,533
80,593
kWh
$1,171
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs