ITAC Assessment: OR0723
ITAC logo
ITAC Assessment: OR0723
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Lavatories, monuments, interior retrofit
NAICS 541330: Engineering Services
SIC 8711: Engineering Services
Sales Range $100
M
to 500
M
# of Employees 529
Plant Area 247,000
ft2
Annual Production 204,000
units
Production Hrs. Annual 3,600
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,524 3,118,800
kWh
Electricity Demand $34,371 9,113
kW-mo/yr
Electricity Fees $2,784 -
Natural Gas $16,789 2,532
MMBtu
TOTAL YEARLY COSTS $286,468
RECOMMENDED SAVINGS* $514,934 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $493,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Increase in Production Savings
01 4.513: Re-arrange equipment layout to reduce labor costs $488,033 $1,500,000 - - $291,600 $196,433
02 2.2437: Recover waste heat from equipment $21,541 $1,027 $19,040
262,617
kWh
$2,501
-
kW-mo/yr
- -
03 2.2694: Use highest temperature for chilling or cold storage $5,360 $1,789 $4,909
67,712
kWh
$451
-
kW-mo/yr
- -
TOTAL RECOMMENDED $514,934 $1,502,816 $23,949
330,329
kWh
$2,952
-
kW-mo/yr
$291,600 $196,433
TOTAL IMPLEMENTED $493,393 $1,501,789 $4,909
67,712
kWh
$451
-
kW-mo/yr
$291,600 $196,433
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs