| Assessment Year | 2019 |
|---|---|
| Principal Product | Lavatories, monuments, interior retrofit |
| NAICS | 541330: Engineering Services |
| SIC | 8711: Engineering Services |
| Sales Range | $100 M to 500M |
| # of Employees | 529 |
| Plant Area |
247,000
ft2
|
| Annual Production | 204,000
units
|
| Production Hrs. Annual | 3,600
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $232,524 | 3,118,800 |
kWh
|
$0.075 |
| Electricity Demand | $34,371 | 9,113 |
kW-mo/yr
|
$3.77 |
| Electricity Fees | $2,784 | - |
|
- |
| Natural Gas | $16,789 | 2,532 |
MMBtu
|
$6.63 |
| TOTAL YEARLY COSTS | $286,468 | |||
| RECOMMENDED SAVINGS* | $514,934 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $493,393 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.513: Re-arrange equipment layout to reduce labor costs | $488,033 | $1,500,000 | - | - | $291,600 | $196,433 | |
| 02 | 2.2437: Recover waste heat from equipment | $21,541 | $1,027 |
$19,040
262,617
kWh
|
$2,501
-
kW-mo/yr
|
- | - | |
| 03 | 2.2694: Use highest temperature for chilling or cold storage | $5,360 | $1,789 |
$4,909
67,712
kWh
|
$451
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $514,934 | $1,502,816 |
$23,949
330,329
kWh
|
$2,952
-
kW-mo/yr
|
$291,600 | $196,433 | ||
| TOTAL IMPLEMENTED | $493,393 | $1,501,789 |
$4,909
67,712
kWh
|
$451
-
kW-mo/yr
|
$291,600 | $196,433 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs