| Assessment Year | 1985 |
|---|---|
| Principal Product | CONVEYING SYSTEMS |
| NAICS |
n/a
|
| SIC | 3535: Conveyors and Conveying Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 276 |
| Plant Area |
n/a
|
| Annual Production | 8,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $148,690 | 1,992,087 |
kWh
|
$0.075 |
| Natural Gas | $75,303 | 9,742 |
MMBtu
|
$7.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,814 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,942 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,538 | $136 |
$8,538
114,302
kWh
|
- | |
| 02 | 2.6121: Reduce hot water temperature to the minimum required | $1,120 | - | - |
$1,120
-
MMBtu
|
|
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $939 | $700 |
$1,683
22,567
kWh
|
$(-744.0)
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,817 | $1,597 |
$2,817
37,808
kWh
|
- | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $752 | $5,600 |
$(-789.0)
(-10,551)
kWh
|
$1,541
-
MMBtu
|
|
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $13,005 | - | - |
$13,005
-
MMBtu
|
|
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,643 | $378 | - |
$2,643
-
MMBtu
|
|
| TOTAL RECOMMENDED | $29,814 | $8,411 |
$12,249
164,126
kWh
|
$17,565
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,942 | $2,811 |
$13,038
174,677
kWh
|
$14,904
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs