Assessment Year 2014
Principal Product Woodturning Products
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 7,500
ft2
Annual Production 65,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,686 80,173
kWh
Electricity Fees $1,778 -
Natural Gas $2,776 252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $297 - $297
2,667
kWh
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $235 $500 $235
2,110
kWh
- - - - -
03 2.4239: Eliminate or reduce compressed air usage $434 $300 $434
3,900
kWh
- - - - -
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $300 $1,700 - - - - $300 -
05 3.5317: Sell / offer by-product as animal feed $1,300 $2,500 - - - - - $1,300
06 2.7142: Utilize higher efficiency lamps and/or ballasts $359 $266 $183
1,647
kWh
- $35 $141 - -
07 2.7131: Add area lighting switches $331 $221 $331
2,978
kWh
- - - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $74 $17 $74
668
kWh
- - - - -
09 2.7224: Reduce space conditioning during non-working hours $162 - $21
192
kWh
$141
-
MMBtu
- - - -
TOTAL RECOMMENDED $3,492 $5,504 $1,575
14,162
kWh
$141
-
MMBtu
$35 $141 $300 $1,300
TOTAL IMPLEMENTED $1,759 $2,500 $318
2,859
kWh
$141
-
MMBtu
- - - $1,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs