ITAC Assessment: OR0738
ITAC logo
ITAC Assessment: OR0738
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Concrete molds and palletizing equipment
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 510
Plant Area 350,000
ft2
Annual Production 259,056
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,031 5,820,136
kWh
Electricity Demand $109,512 16,176
kW-mo/yr
Electricity Fees $17,903 -
Natural Gas $159,378 23,588
MMBtu
Waste Disposal Costs
Water Usage $9,567 3,234
Tgal
TOTAL YEARLY COSTS $570,391
RECOMMENDED SAVINGS* $257,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Primary Product Savings
01 4.431: Train operators for maximum operating efficiency $242,489 $81,465 - - $242,489
02 2.3212: Optimize plant power factor $13,131 $8,725 - $13,131 -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,831 $1,000 $1,831
39,370
kWh
- -
TOTAL RECOMMENDED $257,451 $91,190 $1,831
39,370
kWh
$13,131 $242,489
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs