Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0667 #05 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $756 $300
NC0667 #04 Y:2021 Recover waste heat from equipment $10,960 $1,960
NC0667 #03 Y:2021 Turn off equipment when not in use $4,354 $2,000
NC0667 #02 Y:2021 Install fossil fuel make-up air unit $11,532 $30,000
NC0667 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,346 $3,990
NC0669 #04 Y:2021 Replace existing hvac unit with high efficiency model $8,310 $30,000
NC0669 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $854 $300
NC0669 #02 Y:2021 Recover waste heat from equipment $16,266 $40,000
NC0669 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $8,041 $11,374
NC0668 #05 Y:2021 Use / purchase optimum sized compressor $6,271 $22,000
NC0668 #04 Y:2021 Turn off equipment when not in use $2,843 $6,325
NC0668 #03 Y:2021 Recover waste heat from equipment $2,314 $8,000
NC0668 #02 Y:2021 Install occupancy sensors $69 $280
NC0668 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,512 $5,587
NC0666 #04 Y:2021 Use heat from boiler blowdown to preheat boiler feed water $4,768 $10,000
NC0666 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $2,259 $50
NC0666 #02 Y:2021 Size electric motors for peak operating efficiency $24,876 $50,000
NC0666 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $36,200 $51,808
NC0665 #03 Y:2021 Recover waste heat from equipment $5,642 $2,000
NC0665 #02 Y:2021 Recover waste heat from equipment $1,072 $1,000