ITAC Assessment: NC0666
ITAC logo
ITAC Assessment: NC0666
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Knitted goods
NAICS 313240: Knit Fabric Mills
SIC 2257: Weft Knit Fabric Mills
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 240,000
ft2
Annual Production 39,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $449,000 8,589,000
kWh
Electricity Demand $292,852 22,725
kW-mo/yr
Natural Gas $333,057 80,714
MMBtu
Waste Disposal Costs
Water Usage $181,318 90,660
Tgal
TOTAL YEARLY COSTS $1,256,227
RECOMMENDED SAVINGS* $68,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $36,200 $51,808 $23,578
450,831
kWh
$12,622
-
kW-mo/yr
- -
02 2.4131: Size electric motors for peak operating efficiency $24,876 $50,000 $16,663
318,600
kWh
$8,213
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,259 $50 $1,516
28,994
kWh
$743
-
kW-mo/yr
- -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $4,768 $10,000 - - $4,581
-
MMBtu
$187
-
Tgal
TOTAL RECOMMENDED $68,103 $111,858 $41,757
798,425
kWh
$21,578
-
kW-mo/yr
$4,581
-
MMBtu
$187
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs