ITAC Assessment: NC0667
ITAC logo
ITAC Assessment: NC0667
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Nonwoven fabrics
NAICS 313230: Nonwoven Fabric Mills
SIC 2297: Non-woven Fabrics
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 210,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $875,342 20,070,070
kWh
Electricity Demand $489,574 40,394
kW-mo/yr
Electricity Fees $3,467 -
LPG $86,672 10,600
MMBtu
Fuel Oil #2 $176,940 15,603
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $1,631,996
RECOMMENDED SAVINGS* $30,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,346 $3,990 $3,132
49,476
kWh
$214
-
kW-mo/yr
- -
02 2.7235: Install fossil fuel make-up air unit $11,532 $30,000 $7,869
198,200
kWh
$10,575
-
kW-mo/yr
$(-6,912.0)
-
MMBtu
-
03 2.6218: Turn off equipment when not in use $4,354 $2,000 $4,354
109,662
kWh
- - -
04 2.2437: Recover waste heat from equipment $10,960 $1,960 - - - $10,960
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $756 $300 $505
12,724
kWh
$251
-
kW-mo/yr
- -
TOTAL RECOMMENDED $30,948 $38,250 $15,860
370,062
kWh
$11,040
-
kW-mo/yr
$(-6,912.0)
-
MMBtu
$10,960
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs