Assessment Year | 2021 |
---|---|
Principal Product | Nonwoven fabrics |
NAICS | 313230: Nonwoven Fabric Mills |
SIC | 2297: Non-woven Fabrics |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
210,000
ft2
|
Annual Production | 9,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $875,342 | 20,070,070 |
kWh
|
$0.044 | |
Electricity Demand | $489,574 | 40,394 |
kW-mo/yr
|
$12.12 | |
Electricity Fees | $3,467 | - |
|
- | |
LPG | $86,672 | 10,600 |
MMBtu
|
$8.18 | |
Fuel Oil #2 | $176,940 | 15,603 |
MMBtu
|
$11.34 | |
Waste Disposal Costs | |||||
Water Usage | $1 | 1 |
Tgal
|
$1.00 | |
TOTAL YEARLY COSTS | $1,631,996 | ||||
RECOMMENDED SAVINGS* | $30,948 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,346 | $3,990 |
$3,132
49,476
kWh
|
$214
-
kW-mo/yr
|
- | - | |
02 | 2.7235: Install fossil fuel make-up air unit | $11,532 | $30,000 |
$7,869
198,200
kWh
|
$10,575
-
kW-mo/yr
|
$(-6,912.0)
-
MMBtu
|
- | |
03 | 2.6218: Turn off equipment when not in use | $4,354 | $2,000 |
$4,354
109,662
kWh
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $10,960 | $1,960 | - | - | - |
$10,960
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $756 | $300 |
$505
12,724
kWh
|
$251
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $30,948 | $38,250 |
$15,860
370,062
kWh
|
$11,040
-
kW-mo/yr
|
$(-6,912.0)
-
MMBtu
|
$10,960
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs