ITAC Assessment: WI0484
ITAC logo
ITAC Assessment: WI0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Laminated hard wood and plywood
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 128
Plant Area 348,720
ft2
Annual Production 20,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,671 5,591,523
kWh
Electricity Demand $168,996 21,213
kW-mo/yr
Electricity Fees $17,380 -
Natural Gas $353,718 54,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,843 $44,480 $13,617
432,320
kWh
$7,226
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $2,603 $3,060 $2,603
82,620
kWh
- -
03 2.7444: Close holes and openings in building such as broken windows $14,141 $60,000 $1,936
61,440
kWh
$1,064
-
kW-mo/yr
$11,141
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $13,391 $5,500 - - $13,391
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,240 $500 - - $2,240
-
MMBtu
06 2.2511: Insulate bare equipment $1,787 $400 - - $1,787
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $4,880 $11,000 - - $4,880
-
MMBtu
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,010 - - $3,010
-
kW-mo/yr
-
09 2.2437: Recover waste heat from equipment $2,689 - $1,234
39,165
kWh
$1,455
-
kW-mo/yr
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,942 $1,054 $1,268
40,284
kWh
$674
-
kW-mo/yr
-
TOTAL RECOMMENDED $67,526 $125,994 $20,658
655,829
kWh
$13,429
-
kW-mo/yr
$33,439
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs