ITAC Assessment: NC0669
ITAC logo
ITAC Assessment: NC0669
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Aircraft components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 104,260
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,173 4,955,178
kWh
Electricity Demand $184,035 12,044
kW-mo/yr
Electricity Fees $55,160 -
Natural Gas $131,023 21,508
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $535,392
RECOMMENDED SAVINGS* $33,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,041 $11,374 $3,579
107,477
kWh
$4,462
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $16,266 $40,000 - - $16,266
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $854 $300 $380
11,419
kWh
$474
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $8,310 $30,000 $3,818
114,660
kWh
$4,492
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,471 $81,674 $7,777
233,556
kWh
$9,428
-
kW-mo/yr
$16,266
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs