ITAC Assessment: LM0117
ITAC logo
ITAC Assessment: LM0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product canned pudding
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2032: Canned Specialties
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 98,234
ft2
Annual Production 103,459,305
lb
Production Hrs. Annual 4,983
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $525,280 8,192,897
kWh
Electricity Demand $363,092 19,769
kW-mo/yr
Electricity Fees $46,872 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $240,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $229,392

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Increase in Production Savings
01 4.431: Train operators for maximum operating efficiency $125,343 $20,000 $1,343
18,600
kWh
- $124,000 -
02 4.651: Install back-up equipment $86,200 $105,000 $3,700
51,000
kWh
- - $82,500
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,007 $6,550 $1,950
27,000
kWh
$3,057
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $15,788 $3,000 $6,149
85,176
kWh
$9,639
-
kW-mo/yr
- -
05 2.3132: Recharge batteries on during off-peak demand periods $6,467 $3,500 $2,364
-
kWh
$4,103
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $2,061 $500 $1,441
19,960
kWh
$620
-
kW-mo/yr
- -
TOTAL RECOMMENDED $240,866 $138,550 $16,947
201,736
kWh
$17,419
-
kW-mo/yr
$124,000 $82,500
TOTAL IMPLEMENTED $229,392 $128,500 $12,633
174,736
kWh
$10,259
-
kW-mo/yr
$124,000 $82,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs