ITAC Assessment: SD0226
ITAC logo
ITAC Assessment: SD0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 112
Plant Area 45,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,701 1,778,136
kWh
Electricity Demand $32,059 3,940
kW-mo/yr
Natural Gas $579 81
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,751 $4,040 $1,320
19,343
kWh
$431
-
kW-mo/yr
- - - -
02 2.7144: Install spectral reflectors / delamp $1,824 $2,400 $1,375
20,223
kWh
$449
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,129 $50 $917
13,482
kWh
$212
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,584 $400 $1,261
18,464
kWh
$323
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $488 $800 $438
6,448
kWh
$50
-
kW-mo/yr
- - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,751 - $1,420
20,809
kWh
$2,331
-
kW-mo/yr
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $73,351 $169,125 $61,724
907,972
kWh
$11,627
-
kW-mo/yr
- - - -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $903 - - - - - - $903
09 3.5217: Reuse / recycle/ sell paper products $1,618 - - - - - $1,618
-
lb
-
10 3.8133: Convert to aqueous cleaning $1,362 - - - - $1,362
-
gal
- -
11 3.7311: Maintain machines to reduce leaks $1,103 $385 - - $1,103
-
Tgal
- - -
12 4.651: Install back-up equipment $1,728 - - - - - - $1,728
TOTAL RECOMMENDED $90,592 $177,200 $68,455
1,006,741
kWh
$15,423
-
kW-mo/yr
$1,103
-
Tgal
$1,362
-
gal
$1,618
-
lb
$2,631
TOTAL IMPLEMENTED $11,839 $4,875 $4,918
72,098
kWh
$3,297
-
kW-mo/yr
$1,103
-
Tgal
- $1,618
-
lb
$903
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs