Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0204 #01 Y:1990 Reschedule plant operations or reduce load to avoid peaks $7,629 -
MA0203 #05 Y:1990 Install set-back timers $642 $161
MA0203 #04 Y:1990 Utilize higher efficiency lamps and/or ballasts $12,651 $32,018
MA0203 #03 Y:1990 Install / repair insulation on condensate lines $778 $547
MA0203 #02 Y:1990 Install / repair insulation on steam lines $7,245 $2,182
MA0203 #01 Y:1990 Use direct air supply to exhaust hoods $13,019 $8,029
MA0202 #04 Y:1990 Reduce heat gain by window tinting $9,467 $37,380
MA0202 #03 Y:1990 Insulate bare equipment $196 -
MA0202 #02 Y:1990 Reduce hot water temperature to the minimum required $2,469 $2,800
MA0202 #01 Y:1990 Use proper thickness of insulation on building envelope $458 $1,012
MA0201 #04 Y:1990 Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,784 $500
MA0201 #03 Y:1990 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $159,131 $425,925
MA0201 #02 Y:1990 Insulate bare equipment $2,084 $1,762
MA0201 #01 Y:1990 Insulate bare equipment $2,084 $1,762
MA0200 #05 Y:1990 Use most efficient type of electric motors $486 $451
MA0200 #04 Y:1990 Utilize higher efficiency lamps and/or ballasts $106 $73
MA0200 #03 Y:1990 Utilize higher efficiency lamps and/or ballasts $3,023 $15,974
MA0200 #02 Y:1990 Repair or replace steam traps $4,450 $2,880
MA0200 #01 Y:1990 Use or replace with energy efficient substitutes $45,965 $47,912
MA0199 #07 Y:1990 Utilize higher efficiency lamps and/or ballasts $3,137 $3,492