ITAC Assessment: MA0199
ITAC logo
ITAC Assessment: MA0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product VARIOUS GRADES OF PAPER
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $547,307 9,748,828
kWh
Fuel Oil #6 $445,591 145,449
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $29,260 $96,000 - $29,260
-
MMBtu
02 2.2123: Insulate feedwater tank $1,053 $352 - $1,053
-
MMBtu
03 2.2511: Insulate bare equipment $147 $118 - $147
-
MMBtu
04 2.2444: Use hot process fluids to preheat incoming process fluids $19,829 $22,178 $(-2,846.0)
(-50,703)
kWh
$22,675
-
MMBtu
05 2.7224: Reduce space conditioning during non-working hours $2,282 $200 $2,282
40,739
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,992 $21,942 $17,992
320,633
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,137 $3,492 $3,137
55,979
kWh
-
TOTAL RECOMMENDED $73,700 $144,282 $20,565
366,648
kWh
$53,135
-
MMBtu
TOTAL IMPLEMENTED $24,019 $26,022 $291
5,276
kWh
$23,728
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs