ITAC Assessment: LE0606
ITAC logo
ITAC Assessment: LE0606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Medical spray and valve system
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 147
Plant Area 160,000
ft2
Annual Production 1,200,000
units
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $801,189 18,244,812
kWh
Electricity Demand $299,502 33,798
kW-mo/yr
Electricity Fees $9,692 -
Natural Gas $82,169 6,745
MMBtu
Waste Disposal Costs
Water Usage $34,639 3,065
Tgal
TOTAL YEARLY COSTS $1,227,191
RECOMMENDED SAVINGS* $50,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,594 - $3,602
81,856
kWh
$992
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $8,437 $240 $2,830
64,311
kWh
- $5,607
-
MMBtu
03 2.7261: Install timers and/or thermostats $6,951 $2,190 $6,062
137,779
kWh
- $889
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $3,974 $4,000 $3,575
81,245
kWh
$399
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $135 $140 $135
3,066
kWh
- -
06 2.4226: Use / purchase optimum sized compressor $23,604 $65,464 $18,501
420,480
kWh
$5,103
-
kW-mo/yr
-
07 2.2442: Preheat combustion air with waste heat $2,380 $10,000 $(-645.0)
(-14,663)
kWh
$(-239.0)
-
kW-mo/yr
$3,264
-
MMBtu
TOTAL RECOMMENDED $50,075 $82,034 $34,060
774,074
kWh
$6,255
-
kW-mo/yr
$9,760
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs