ITAC Assessment: OK0536
ITAC logo
ITAC Assessment: OK0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Biscuits
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 200,000
ft2
Annual Production 395,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,539 13,183,763
kWh
Electricity Demand $200,240 54,840
kW-mo/yr
Natural Gas $100,229 36,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,898 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,719

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7135: Install occupancy sensors $3,824 $1,549 $3,824
129,543
kWh
- - -
02 2.7111: Reduce illumination to minimum necessary levels $2,758 $224 $2,205
74,736
kWh
$553
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $332 $689 $249
8,499
kWh
$83
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $365 - $365
12,309
kWh
- - -
05 2.7132: Install timers on light switches in little used areas $825 $99 $825
27,843
kWh
- - -
06 3.4155: Meter waste water $75,704 - - - $75,704
-
Tgal
-
07 3.1162: Use less wasteful packaging $4,440 - - - - $4,440
-
lb
08 3.5316: Contract a wood pallet recycling company $1,650 - - - - $1,650
-
lb
TOTAL RECOMMENDED $89,898 $2,561 $7,468
252,930
kWh
$636
-
kW-mo/yr
$75,704
-
Tgal
$6,090
-
lb
TOTAL IMPLEMENTED $77,719 - $365
12,309
kWh
- $75,704
-
Tgal
$1,650
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs