ITAC Assessment: KU0535
ITAC logo
ITAC Assessment: KU0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product vinyl siding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 180,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 8,280
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $413,833 16,307,738
kWh
Electricity Demand $268,139 29,771
kW-mo/yr
Natural Gas $32,275 8,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.8114: Change rate schedules or other changes in utility service $16,650 $200 - - - $16,650 -
02 2.4239: Eliminate or reduce compressed air usage $7,250 $2,640 $4,420
197,538
kWh
$2,830
-
kW-mo/yr
- - -
03 2.2612: Use cooling tower water instead of refrigeration $1,870 $1,250 $1,870
83,529
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $900 $90
4,103
kWh
$40
-
kW-mo/yr
$400 - -
05 4.441: Install automatic packing equipment $125,200 $140,000 $(-2,770.0)
(-123,681)
kWh
$(-1,330.0)
-
kW-mo/yr
$69,970 - $59,330
TOTAL RECOMMENDED $151,500 $144,990 $3,610
161,489
kWh
$1,540
-
kW-mo/yr
$70,370 $16,650 $59,330
TOTAL IMPLEMENTED $9,650 $4,790 $6,380
285,170
kWh
$2,870
-
kW-mo/yr
$400 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs