Assessment Year | 1999 |
---|---|
Principal Product | Men's shirts |
NAICS |
n/a
|
SIC | 2321: Men's and Boys' Shirts, Except Work Shirts |
Sales Range | $10 M to 50M |
# of Employees | 425 |
Plant Area |
280,760
ft2
|
Annual Production | 130,000
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,188 | 2,071,805 |
kWh
|
$0.060 |
Electricity Demand | $81,979 | 8,084 |
kW-mo/yr
|
$10.14 |
Electricity Fees | $4,419 | - |
|
- |
Fuel Oil #6 | $23,016 | 10,353 |
MMBtu
|
$2.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,431 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.631: Install an uninteruptable power supply | $6,000 | $1,500 | n/a | - | - | - | - | $6,000 |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,486 | $1,468 | n/a | - | - |
$2,486
-
MMBtu
|
- | - |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,395 | - | n/a | - |
$491
-
kW-mo/yr
|
$1,087
-
MMBtu
|
$(-183.0)
-
MMBtu
|
- |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,263 | $400 | n/a |
$1,263
21,102
kWh
|
- | - | - | - |
05 | 4.821: Pay bills on time to avoid late fees | $1,075 | - | n/a | - | - | - | - | $1,075 |
06 | 2.2511: Insulate bare equipment | $520 | $382 | n/a | - |
$420
-
kW-mo/yr
|
- |
$100
-
MMBtu
|
- |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $419 | $300 | n/a |
$419
7,034
kWh
|
- | - | - | - |
08 | 2.4133: Use most efficient type of electric motors | $273 | $994 | n/a |
$273
4,689
kWh
|
- | - | - | - |
TOTAL RECOMMENDED | $13,431 | $5,044 |
$1,955
32,825
kWh
|
$911
-
kW-mo/yr
|
$3,573
-
MMBtu
|
$(-83.0)
-
MMBtu
|
$7,075 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs