ITAC Assessment: MA0202
ITAC logo
ITAC Assessment: MA0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product WRITING PENS
NAICS
n/a
SIC 3951: Pens, Mechanical Pencils, and Parts
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 4,355
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,566 250,879
kWh
Fuel Oil #4 $16,457 3,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.7492: Use proper thickness of insulation on building envelope $458 $1,012 - $458
-
MMBtu
02 2.6121: Reduce hot water temperature to the minimum required $2,469 $2,800 - $2,469
-
MMBtu
03 2.2511: Insulate bare equipment $196 - $196
2,345
kWh
-
04 2.7423: Reduce heat gain by window tinting $9,467 $37,380 - $9,467
-
MMBtu
TOTAL RECOMMENDED $12,590 $41,192 $196
2,345
kWh
$12,394
-
MMBtu
TOTAL IMPLEMENTED $12,590 $41,192 $196
2,345
kWh
$12,394
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs