ITAC Assessment: MI0404
ITAC logo
ITAC Assessment: MI0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Chemical and organic extracts
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 125,000
ft2
Annual Production 9,800,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,130 4,824,554
kWh
Electricity Demand $64,778 6,643
kW-mo/yr
Electricity Fees $64,767 -
Natural Gas $43,107 11,053
MMBtu
Waste Disposal Costs
Water Usage $25,753 5,941
Tgal
Water Disposal $32,438 5,941
Tgal
TOTAL YEARLY COSTS $468,973
RECOMMENDED SAVINGS* $51,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,328

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7221: Lower temperature during the winter season and vice-versa $28,220 $580 $22,165
452,343
kWh
$6,055
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $9,764 $479 $7,404
151,093
kWh
$2,360
-
kW-mo/yr
- -
03 3.4155: Meter waste water $8,108 $1,533 - - - $8,108
-
Tgal
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,549 $1,660 $1,652
33,723
kWh
$897
-
kW-mo/yr
- -
05 2.1241: Reduce excessive boiler blowdown $1,720 $2,088 - - $978
-
MMBtu
$742
-
Tgal
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,392 $2,520 - - $1,392
-
MMBtu
-
TOTAL RECOMMENDED $51,753 $8,860 $31,221
637,159
kWh
$9,312
-
kW-mo/yr
$2,370
-
MMBtu
$8,850
-
Tgal
TOTAL IMPLEMENTED $36,328 $2,113 $22,165
452,343
kWh
$6,055
-
kW-mo/yr
- $8,108
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs