ITAC Assessment: UU0212
ITAC logo
ITAC Assessment: UU0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Folding Chairs
NAICS 337127: Institutional Furniture Manufacturing
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 100,000
ft2
Annual Production 320,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,788 1,655,879
kWh
Electricity Demand $134,263 8,267
kW-mo/yr
Electricity Fees $29,117 -
Natural Gas $88,369 10,537
MMBtu
TOTAL YEARLY COSTS $311,537
RECOMMENDED SAVINGS* $44,482 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,149 $8,500 $3,456
96,000
kWh
$11,693
-
kW-mo/yr
- - -
02 2.1224: Replace boiler $11,580 $80,000 - - - $7,005
-
MMBtu
$4,575
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,326 $21,555 $4,068
112,989
kWh
$4,258
-
kW-mo/yr
- - -
04 2.3212: Optimize plant power factor $4,400 $9,000 - - $4,400 - -
05 2.2515: Use optimum thickness insulation $4,220 $4,402 - - - $4,220
-
MMBtu
-
06 2.2444: Use hot process fluids to preheat incoming process fluids $425 $850 - - - $425
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $382 $1,370 $382
10,624
kWh
- - - -
TOTAL RECOMMENDED $44,482 $125,677 $7,906
219,613
kWh
$15,951
-
kW-mo/yr
$4,400 $11,650
-
MMBtu
$4,575
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs