Assessment Year | 2023 |
---|---|
Principal Product | Folding Chairs |
NAICS | 337127: Institutional Furniture Manufacturing |
SIC | 2531: Public Building and Related Furniture |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
100,000
ft2
|
Annual Production | 320,000
units
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,788 | 1,655,879 |
kWh
|
$0.036 |
Electricity Demand | $134,263 | 8,267 |
kW-mo/yr
|
$16.24 |
Electricity Fees | $29,117 | - |
|
- |
Natural Gas | $88,369 | 10,537 |
MMBtu
|
$8.39 |
TOTAL YEARLY COSTS | $311,537 | |||
RECOMMENDED SAVINGS* | $44,482 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,149 | $8,500 |
$3,456
96,000
kWh
|
$11,693
-
kW-mo/yr
|
- | - | - | |
02 | 2.1224: Replace boiler | $11,580 | $80,000 | - | - | - |
$7,005
-
MMBtu
|
$4,575 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,326 | $21,555 |
$4,068
112,989
kWh
|
$4,258
-
kW-mo/yr
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $4,400 | $9,000 | - | - | $4,400 | - | - | |
05 | 2.2515: Use optimum thickness insulation | $4,220 | $4,402 | - | - | - |
$4,220
-
MMBtu
|
- | |
06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $425 | $850 | - | - | - |
$425
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $382 | $1,370 |
$382
10,624
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $44,482 | $125,677 |
$7,906
219,613
kWh
|
$15,951
-
kW-mo/yr
|
$4,400 |
$11,650
-
MMBtu
|
$4,575 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs