ITAC Assessment: CO0615
ITAC logo
ITAC Assessment: CO0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Fabricated glass products
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 199,000
ft2
Annual Production 20,500
thousand feet
Production Hrs. Annual 4,680
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,102 1,562,946
kWh
Electricity Demand $116,921 7,373
kW-mo/yr
Electricity Fees $362 -
Natural Gas $18,869 2,174
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $6,560 $12,000 - $6,560
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $6,490 $1,000 $6,490
139,700
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,960 $1,500 $1,260
27,200
kWh
$700
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,280 $13,730 $5,890
126,900
kWh
$4,360
-
kW-mo/yr
$200 $(-170.0)
05 2.9114: Use solar heat to make electricty $1,930 $11,000 $680
14,600
kWh
$1,250
-
kW-mo/yr
- -
TOTAL RECOMMENDED $27,220 $39,230 $14,320
308,400
kWh
$12,870
-
kW-mo/yr
$200 $(-170.0)
TOTAL IMPLEMENTED $8,450 $2,500 $7,750
166,900
kWh
$700
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs