Assessment Year | 2002 |
---|---|
Principal Product | Corrugated Cardboard |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 164 |
Plant Area |
200,000
ft2
|
Annual Production | 830,000
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,081 | 4,943,520 |
kWh
|
$0.035 |
Electricity Demand | $64,060 | - |
|
- |
Electricity Fees | $16,434 | - |
|
- |
Natural Gas | $272,630 | 44,436 |
MMBtu
|
$6.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $304,935 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,721 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $5,760 | $9,780 | - | - |
$5,760
-
MMBtu
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,120 | $900 |
$3,420
98,856
kWh
|
- | - | - | $(-300.0) | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,265 | $10 |
$859
24,830
kWh
|
$406
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,998 | $15,836 |
$3,644
105,331
kWh
|
$1,146
-
kW-mo/yr
|
- | - | - | $5,208 | |
05 | 2.7135: Install occupancy sensors | $711 | $450 |
$711
20,571
kWh
|
- | - | - | - | - | |
06 | 2.6232: Install set-back timers | $2,130 | $332 | - | - |
$2,130
-
MMBtu
|
- | - | - | |
07 | 2.7229: Air condition only space necessary | $446 | - |
$243
7,020
kWh
|
$203
-
kW-mo/yr
|
- | - | - | - | |
08 | 4.122: Develop standard procedures to improve internal yields | $245,550 | $11,639 | - | - | - |
$244,200
-
lb
|
$5,400 | $(-4,050.0) | |
09 | 4.426: Modify workload | $35,955 | - | - | - | - | - | $41,600 | $(-5,645.0) | |
TOTAL RECOMMENDED | $304,935 | $38,947 |
$8,877
256,608
kWh
|
$1,755
-
kW-mo/yr
|
$7,890
-
MMBtu
|
$244,200
-
lb
|
$46,700 | $(-4,487.0) | ||
TOTAL IMPLEMENTED | $12,721 | $11,022 |
$4,522
130,706
kWh
|
$609
-
kW-mo/yr
|
$7,890
-
MMBtu
|
- | $(-300.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs