ITAC Assessment: IC0021
ITAC logo
ITAC Assessment: IC0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Steel Construction Studs
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 80,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 4,335
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,556 297,653
kWh
Electricity Demand $10,753 977
kW-mo/yr
Natural Gas $76,429 8,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $474

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,966 $41,300 $4,516
102,636
kWh
$6,650
-
kW-mo/yr
- - - $800
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $474 $400 $280
6,359
kWh
$194
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $129 $550 $77
1,744
kWh
$52
-
kW-mo/yr
- - - -
04 2.7243: Improve air circulation with destratification fans / other methods $3,684 - $(-1,166.0)
(-26,497)
kWh
$(-738.0)
-
kW-mo/yr
$5,588
-
MMBtu
- - -
05 4.447: Automate payroll system $2,350 $1,900 - - - $950 $1,400 -
TOTAL RECOMMENDED $18,603 $44,150 $3,707
84,242
kWh
$6,158
-
kW-mo/yr
$5,588
-
MMBtu
$950 $1,400 $800
TOTAL IMPLEMENTED $474 $400 $280
6,359
kWh
$194
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs