ITAC Assessment: OK0157
ITAC logo
ITAC Assessment: OK0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product DISPOSABLE CAPS & GOWNS
NAICS
n/a
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 52
Plant Area
n/a
Annual Production 400,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,030 216,002
kWh
Natural Gas $8,255 1,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,470

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,475 $201 $1,475
19,930
kWh
- -
02 2.7111: Reduce illumination to minimum necessary levels $327 $81 $327
4,396
kWh
- -
03 2.2122: Install / repair insulation on condensate lines $373 $87 - $373
-
MMBtu
-
04 2.2122: Install / repair insulation on condensate lines $557 $584 - $577
-
MMBtu
$(-20.0)
05 2.2136: Install / repair insulation on steam lines $1,705 $620 - $1,736
-
MMBtu
$(-31.0)
06 2.7261: Install timers and/or thermostats $902 $165 - $902
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $131 $500 - $131
-
MMBtu
-
TOTAL RECOMMENDED $5,470 $2,238 $1,802
24,326
kWh
$3,719
-
MMBtu
$(-51.0)
TOTAL IMPLEMENTED $5,470 $2,238 $1,802
24,326
kWh
$3,719
-
MMBtu
$(-51.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs